
Standby generator for a factory
A set sized to the loads that must stay on during an outage, then commissioned on site.
View job
Pump, pipe, and application designed so the last line still gets water.
Agric & Machinery · Uganda
Farm
Water was mapped from source to the far boundary. The pump and layout were chosen for the dry months and for a team that can keep the scheme running.
Testing stayed on site until the far end of the garden was wet, not only the nearest beds.

A set sized to the loads that must stay on during an outage, then commissioned on site.
View job
Daytime solar that can live with a generator when the evening load rises.
View job
Implements specified for the crop, the soil, and the people who will run them.
View job